Project Name:
Detailed Engineering Design for the Water Infrastructure for Priority Investment Projects for Bulk Water System in the West Bank
Client:
The Palestinian Water Authority/ funded by World Bank
Project Description:
Under the Associated Works Project, the Palestinian Water Authority has requested the World Bank to prepare the detailed engineering design for the Water Supply and Sanitation infrastructure priority projects to be ready for investments once available.
The aim of this project is to develop integrated systems for water supply at different regions in the West Bank, with the overall objective to satisfy basic needs in drinking water supply for the population of selected areas in Palestine and to secure improved public health and environmental conditions.
The current assignment will focus on water infrastructure projects as presented in the projects below:
- As Samua Connection Water System: which includes design works for Main transmission pipelines, Additional Storage Reservoirs, and design of Pump Station at Al Samu’ New Connection.
- Ras Al Taweel Regional Water Reservoir Project: which includes design works for 3,000 m3 regional water Reservoir, Main transmission pipeline, Distribution pipelines from the water reservoir location, All required water chambers and flow monitoring chambers, SCADA system at the water reservoir and flow monitoring chambers.
- Improvement of Za’tra Bulk Water Supply System: which includes design works for 2,000 cubic meters regional water reservoir, transmission pipeline , Distribution pipeline, All the required water chambers, SCADA system, and conducting hydraulic analysis to ensure safe and efficient operation.
- Beit Jala New Connection Water System: which includes design works for main transmission pipeline, distribution pipeline, regional water reservoir, All the required water chambers, and SCADA system.
Services:
- Detailed Engineering Design