Location:Ghor Al-SafiClient:Arab Potash CompanyDescription of Project:The Works comprise the installation/construction and completion of the HLP Carnallite Dewatering unit including:
The construction of new steel structure building (HLP Carnallite Dewatering Building).
Fabrication, Supply & Installation of two Splitting boxes for the centrifuge feed.
Installation of new five Carnallite dewatering centrifuges.
Installation of new Belt conveyor.
Installation of new two Wash repulp tank pumps.
Design, Fabrication, Supply & Installation of new Flush water tank.
Supply & Installation of new Flush Water Tank pump.
Services Provided:
Review the Contractor's submittals for materials, shop drawings and mockups for compliance with the Contract requirements.
Inspect the construction works for compliance with drawings and specifications.
Select samples as necessary for inspection as well as for testing by the Contractor to check adherence by the Contractor to the quality set by the Contract.
Monitor the QA/QC procedures followed by the Contractor. This will cover the inspections as well as tests that will be carried out by the Contractor of all materials and equipment.
Receive and review the "As-Built" drawings, Instruction, and Maintenance Manuals for equipment prepared by the Contractor and submit copies to APC upon finalization of the same.
Ensure that the Contractor complies with the necessary requirements for environmental mitigation and protection of the environment.
Review and approve Contractor’s submitted guarantees and warrantees.
Prepare an inspection report following each visit, identifying detected defects, and recommending appropriate actions.