HLP Carnallite Dewatering Unit

Project Name: HLP Carnallite Dewatering Unit  


Location: Ghor Al-Safi  
Client: Arab Potash Company  
Description of Project: The Works comprise the installation/construction and completion of the HLP Carnallite Dewatering unit including:
  • The construction of new steel structure building (HLP Carnallite Dewatering Building).
  • Fabrication, Supply & Installation of two Splitting boxes for the centrifuge feed.
  • Installation of new five Carnallite dewatering centrifuges.
  • Installation of new Belt conveyor.
  • Installation of new two Wash repulp tank pumps.
  • Design, Fabrication, Supply & Installation of new Flush water tank.
  • Supply & Installation of new Flush Water Tank pump.
 
Services Provided:
  • Review the Contractor's submittals for materials, shop drawings and mockups for compliance with the Contract requirements.
  • Inspect the construction works for compliance with drawings and specifications.
  • Select samples as necessary for inspection as well as for testing by the Contractor to check adherence by the Contractor to the quality set by the Contract.
  • Monitor the QA/QC procedures followed by the Contractor. This will cover the inspections as well as tests that will be carried out by the Contractor of all materials and equipment.
  • Receive and review the "As-Built" drawings, Instruction, and Maintenance Manuals for equipment prepared by the Contractor and submit copies to APC upon finalization of the same.
  • Ensure that the Contractor complies with the necessary requirements for environmental mitigation and protection of the environment.
  • Review and approve Contractor’s submitted guarantees and warrantees.
  • Prepare an inspection report following each visit, identifying detected defects, and recommending appropriate actions.